Temporary Pipeline Isolation Without Service Interruption
Advanced Bolting Solutions provides engineered line stopping solutions that allow maintenance, repairs, and modifications to be performed on live pipelines while maintaining operational continuity.
Size Range
Line Stop Size Range : Up to 36"
Isolation
Inflatable Gas Bag Isolation : Up to 48"
Capability
Pressure Capability : Up to 1480 psig
Temperature
Temperature Capability : Up to 200°C
Line stopping is a specialized pipeline isolation technique that temporarily blocks flow in a section of pipeline without requiring a complete system shutdown.
This method allows maintenance, repairs, upgrades, and tie-ins to be completed while minimizing operational disruptions and production losses.
Our line-stopping services are widely utilized in oil & gas, petrochemical, power generation, utility, and infrastructure projects.
- Oil & Gas
- Petrochemical
- Power Plants
- Infrastructure Projects
- Industrial Manufacturing
Pipeline Repairs
Isolate damaged sections for repair activities.
Valve Replacement
Replace valves without complete system shutdown.
Pipeline Diversions
Create temporary bypass arrangements during maintenance.
Tie-In Operations
Enable new connections and expansions.
Asset Upgrades
Support modifications and equipment replacement while maintaining service.
No Full Shutdown Required
Maintain facility productivity during maintenance operations.
Reduced Downtime
Minimize interruptions to critical processes.
Lower Operational Costs
Avoid extensive shutdown and restart procedures.
Enhanced Flexibility
Support planned and emergency maintenance requirements.
Improved Safety
Controlled isolation methods reduce operational risks.
1. Engineering Evaluation
Assessment of pipeline conditions and isolation requirements.
2. Hot Tap Installation
Access points are created on the live pipeline.
3. Line Stop Equipment Deployment
Isolation equipment is installed through the hot tap opening.
4. Temporary Isolation
Flow is safely stopped in the required section.
5. Maintenance or Modification Work
Repair or upgrade activities performed.
6. System Restoration
Equipment removed and pipeline returned to normal service.
Frequently Asked Questions